500kV capacitive voltage transformer
The product adopts fast saturation damping technology, excellent media and insulation materials, advanced and mature vacuum impregnation process, excellent partial discharge performance of capacitors, small size, light weight, reliable sealing performance, and no need for oil change maintenance during normal operation. The transient response characteristics of the product reach the world's advanced level. It has been applied to national key projects such as the State Grid Tibet China Interconnection Project and the State Grid Corporation Zharute to Qingzhou UHV DC Project Zharute Station Project.
Manufacture time: 10 weeks