On the basis of traditional switchgear, the product upgrades the switchgear to a digital switchgear with functions such as one key sequential control, online monitoring, and health diagnosis analysis through primary and secondary deep integration technology, multi in one intelligent monitoring units, and intelligent gateways, meeting the construction needs of new power systems and holographic intelligent operation and maintenance substations. Suitable for nuclear power, power grid, data center, industrial and mining, construction, new energy and other projects ranging from 3 to 12kV.
Manufacturing Time: 2 months.